ArchitectureArchitectureNYS Fairgrounds Exposition CenterOnondaga Lake AmphitheaterInstitute for Veterans and Military Families - Syracuse UniversityWelch Allyn - Building ConsolidationWashington Station - Class A BuildingCENTRO HubAFRC FarmingdaleSUNY Institute of TechnologyCamp Smith ReadinessElmira Meier HallElmira College - Cowles HallClay Town HallSUNY Morrisville Norwich CampusSyracuse Technology GardenInterior DesignInterior DesignSUNY Polytechnic InstituteColgate Campus CenterClay Eye CareEmpower FCU Corporate HeadquartersSyracuse Tech GardenSolvay PaperboardPrivate ResidenceLe Moyne College Dining HallLe Moyne College PlazaCornell General Office BuildingCornell Purcell Community CenterIthaca College Gannett CenterSUNY ESF Baker Laboratory RehabilitationWashington StationElmira College - Meier HallWelch Allyn - Building ConsolidationAFRC FarmingdaleCamp Smith Readiness CenterClay Town HallOBrien & Gere Engineering IncLandscape ArchitectureLandscape ArchitectureOnondaga Lake AmphitheaterChristian Brothers AcademyElmira CollegeOneida Shores ParkNyack Beach State ParkSUNY Polytechnic InstitutePoughkeepsie Bus Transit HubStaybridge SuitesSyracuse University - Sims DriveWelch Allyn - Building ConsolidationStructural EngineeringStructural EngineeringOnondaga Lake AmphitheaterGeotechnical EngineeringGeotechnical EngineeringOnondaga Lake Amphitheater3-D Building Information Modeling (BIM)3-D Building Information Modeling (BIM)SustainabilitySustainabilityWashington StationWelch Allyn - Building Consolidation
Services

High-Tech Manufacturer Expansion

Campus master planning, programming and conceptual design to consolidate personnel and operations to a 44-acre campus-like setting in upstate New York. The planned expansion calls for renovation of the client's existing 90,000 SF headquarters facility (Building 1), and a new $30M, 168,000 SF mixed-use office and light (electronic) manufacturing building (Building 2). The site plan also anticipates a future third building of equal size.

 

Building 1’s employee dining and fitness center space will serve as a link connecting the two structures. This link will be renovated to expand the employee dining area. The fitness center will be relocated to the first floor of Building 2, and will be located adjacent to the dining link with an independent entry to offices above. The expanded dining and fitness facilities will support both Building 1 and Building 2.

 

Building 1 will also be renovated to expand office and meeting spaces into an existing 4,000 SF manufacturing area that is being relocated to Building 2. The new facility’s first floor is planned to accommodate 52,000 SF of manufacturing space (including a 12,000 SF high bay area). The second and third floors will house 10,000 SF of electronics laboratory space, a 100-seat training theater, multiple conference spaces and a mixture of open and enclosed offices to accommodate 700 employees. The upper two office levels are to be connected via a double height space and an open interconnecting stair.
Office areas in the new building will receive daylight from perimeter curtainwall systems and rooftop skylights. Interior offices will be enclosed in glass walls to maximize access to daylighting. Mechanical and electrical systems will be distributed through a raised floor system throughout the upper two office floors. Exterior photovoltaic solar panels will provide 40 kWh of electricity and will also perform double duty as perimeter sunscreens on the building’s south elevation.