315.472.7806
Services
315.472.7806
Home
ArchitectureArchitectureNYS Fairgrounds Exposition CenterOnondaga Lake AmphitheaterInstitute for Veterans and Military Families - Syracuse UniversityWelch Allyn - Building ConsolidationWashington Station - Class A BuildingCENTRO HubAFRC FarmingdaleSUNY Institute of TechnologyCamp Smith ReadinessElmira Meier HallElmira College - Cowles HallClay Town HallSUNY Morrisville Norwich CampusSyracuse Technology GardenInterior DesignInterior DesignSUNY Polytechnic InstituteColgate Campus CenterClay Eye CareEmpower FCU Corporate HeadquartersSyracuse Tech GardenSolvay PaperboardPrivate ResidenceLe Moyne College Dining HallLe Moyne College PlazaCornell General Office BuildingCornell Purcell Community CenterIthaca College Gannett CenterSUNY ESF Baker Laboratory RehabilitationWashington StationElmira College - Meier HallWelch Allyn - Building ConsolidationAFRC FarmingdaleCamp Smith Readiness CenterClay Town HallOBrien & Gere Engineering IncLandscape ArchitectureLandscape ArchitectureOnondaga Lake AmphitheaterChristian Brothers AcademyElmira CollegeOneida Shores ParkNyack Beach State ParkSUNY Polytechnic InstitutePoughkeepsie Bus Transit HubStaybridge SuitesSyracuse University - Sims DriveWelch Allyn - Building ConsolidationStructural EngineeringStructural EngineeringOnondaga Lake AmphitheaterGeotechnical EngineeringGeotechnical EngineeringOnondaga Lake Amphitheater3-D Building Information Modeling (BIM)3-D Building Information Modeling (BIM)SustainabilitySustainabilityWashington StationWelch Allyn - Building Consolidation
Services

SUNY Upstate Medical University - Rehab Labs

REHAB LABS FOR CELL/DEVEL BIO PHASE III 

 

QPK Design provided planning, programming and design services  for the complete renovation of24,000 SF of existing space on the basement, first and second floors of Old Weiskotten Hall’s Northeast Wing to create modular laboratory space with appropriate support spaces on the basement and second floors and flexible office space on the first floor.

 

Work included selective demolition and abatement, finishes, partitions, doors, casework, equipment, HVAC, electrical, plumbing and fire protection systems; and the installation of new partitions, doors, casework and mechanical systems.